Workflow guide · 19 November 2026

Material schedule template for interior design

A free material schedule template as a CSV file: every column explained, a filled example, and the gaps that make a schedule hard to price.

By the ArchiStudio product team

Download the template

The template is a CSV file with 24 columns and 3 example rows. It opens in Excel, Numbers and Google Sheets. Delete the example rows, then add one row for each material, finish or product in the project.

Download the material schedule template (CSV)

Material, finish and FF&E schedules

A material schedule lists the materials and finishes in a project with where each one goes, the product chosen, who supplies it and how much is needed. A finish schedule is the room-by-room list of surface finishes. An FF&E schedule covers furniture, fixtures and equipment. The template works for all of them: add a type column if you keep them in one list.

The columns

Every row answers the same questions, so anyone who picks up the schedule can price it and order from it.

ColumnWhat goes in it
ProjectThe project name, so rows from several projects never mix.
OptionThe design option the row belongs to, such as Option A. Leave it blank when there is only one.
RoomWhere the material goes.
ObjectThe element it covers, such as Feature wall or Island worktop.
Specified materialThe material or product as you would write it on a drawing.
SupplierWho you buy it from in the project's market.
Product codeThe manufacturer's or supplier's code, so the right item arrives.
NotesFinish, size, colour reference, quote reference or anything a buyer needs to know.
ThumbnailA link to a product image, so the row can be recognised at a glance.
Product sourceA link to the product page.
Technical documentA link to the data sheet or specification.
QuantityThe amount needed, as a number, or Unknown until it is measured or confirmed.
Unitm², m, m³, each, set, lot, kg or litre.
Quantity basisWhere the quantity came from: a site measure, a drawing or the supplier's own take-off.
Unit priceThe price of one unit, as a number, or Unknown.
CurrencyThe currency of the quote, such as AED.
Price dateThe date of the quote or catalogue price.
Valid untilThe date the quote expires.
Line estimateQuantity times unit price, in the row's currency. Unknown when either one is unknown.
Lead time daysDays from order to delivery, as the supplier states them.
Availabilityin-stock, made-to-order, unavailable or unknown.
Evidenceunverified, documented or supplier-confirmed.
Checked onThe date you last checked the supplier information.
Missing informationWhat still needs an answer before the row can be issued.

A filled example

The three example rows show a schedule part way through. The worktop is complete: a supplier, a code, a measured quantity, a dated quote that is still valid, a lead time and the supplier's confirmation. The feature wall and the shower tray still have gaps, and their last column says which.

Room and objectQuantityUnit priceLine estimateMissing information
Living room, feature wall24 m², measured from drawing A-201UnknownUnknownSupplier and code, source, price, confirmation, check date, availability, lead time
Kitchen, island worktop6.2 m², from the supplier's templateAED 950AED 5,890Nothing
Master bathroom, shower tray1 each, counted on drawing A-305UnknownUnknownCode, source, price, confirmation, availability, lead time

Habits that keep a schedule priceable

Opening the file

The file is saved as UTF-8 with a byte order mark, so Excel shows m² and other symbols correctly when you open it directly. Numbers opens it as it is, and Google Sheets imports it from File, Import.

From the template to a project

These columns are the specification fields of ArchiStudio's material schedule, in the same order. In ArchiStudio, every object in an opened 3D model gets a row, missing items are flagged as you work, each currency keeps its own subtotal and you can compare finish options object by object. Its own CSV export adds the model's columns, such as the preview finish and the part ID.

Questions

What should a material schedule include?

For each row: where the material goes, the product with its supplier and code, the quantity with its unit and basis, the unit price with its currency and date, the lead time, and links to the product page and data sheet.

What is the difference between a material schedule and an FF&E schedule?

An FF&E schedule covers furniture, fixtures and equipment, the loose and fitted items in a room. A material schedule covers materials and finishes such as flooring, wall finishes and worktops. Many studios keep both in one list with a type column.

Can I use this template in Excel?

Yes. It is a CSV file saved as UTF-8 with a byte order mark, so Excel, Numbers and Google Sheets all open it.

Is the template free?

Yes. Download it, change it and use it on any project.

Why write Unknown instead of leaving a cell empty?

An empty cell or a zero can be read as a confirmed value, and it makes a total look complete. Unknown keeps the gap visible until someone fills it.